Before delivery, we’ll review your property, discuss placement, and answer any questions so your delivery goes as smoothly as possible.
Delivery in 3 steps
- The truck backs up to your prepared, level spot.
- The bed tilts and the container slides off slowly, under the driver’s control.
- The truck pulls forward and the container is set in place.
Before delivery day
- Pick level, firm ground. Gravel, pavement or concrete works best. Grass is fine for short projects; for longer stays, gravel and wood blocking under the container help with drainage.
- Leave room for the truck. The truck needs space for its own length plus the container, and room to maneuver.
- Look up. The truck bed rises during unloading, so check for overhead wires and low branches.
- Clear the way. Move vehicles, trailers and anything else that could block the truck.
- Worried about your driveway? Most driveways can take a container. Our drivers can use wood blocking to help protect asphalt.
- Be there if you can. Someone on site can confirm the exact spot before unloading. If you can’t be there, give us clear instructions in advance.
Not sure your site works? Send us a few photos or give us a call, and we’ll review it before delivery.


